All Issue

2018 Vol.28, Issue 4 Preview Page

Research Article

31 December 2018. pp. 741-753
Abstract
References
1
Gdoura, K., Anane, M., Jellali, S., 2015, Geospatial and AHP-multicriteria analyses to locate and rank suitable sites for groundwater recharge with reclaimed water, Resources, Conservation and Recycling, 104(A), 19-30.
2
MOLIT (Ministry of Land, Infrastructure and Transport), 2017, National Master Plan of Groundwater Management (2017-2026), Sejong, Korea, 168 (in Korean).
3
Moon, S.H., Ha, K, Kim, Y., Yoon, P., 2012, Analysis of groundwater use and discharge in water curtain cultivation areas: Case study of the Cheongweon and Chungju areas, The Journal of Engineering Geology, 22(4), 387-398 (in Korean with English abstract).
10.9720/kseg.2012.4.387
4
MWR (Ministry of Water Resources), 2007, Manual of Artificial Recharge of Ground Water, Government of India, 185.
5
Nasiri, H., Boloorani, A.D., Sabokbar, H.A.F., Jafari, H.R., Hamzeh, M., Rafii, Y., 2013, Determining the most suitable areas for artificial groundwater recharge via an integrated PROMETHEE II-AHP method in GIS environment (case study: Garabaygan Basin, Iran), Environmental Monitoring and Assessment, 185(1), 707-718.
10.1007/s10661-012-2586-022402992
6
Oh, S.H., Kim, Y.C., Koo, M.H., 2011, Modeling artificial groundwater recharge in the Hancheon drainage area, Jeju island, Korea, Journal of Soil and Groundwater Environment, 16(6), 34-45 (in Korean with English abstract).
10.7857/JSGE.2011.16.6.034
7
Ostad-Ali-Askari, K., Shayannejad, M., Ghorbanizadeh-Kharazi, H., 2017, Artificial neural network for modeling nitrate pollution of groundwater in marginal area of Zayandeh-rood River, Isfahan, Iran, KSCE Journal of Civil Engineering, 21(1), 134-140.
10.1007/s12205-016-0572-8
8
Ramu, V.M., Mahalingam, B., 2015, Site suitability analysis for artificial recharge of groundwater using GIS and remote sensing techniques: A study of mandya district, Karnataka, India, Journal of Water Resource Engineering and Management, 2(3), 10-22.
9
Saaty, T.L., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resources Allocation, McGraw-Hill, New York.
10
Saaty, T.L., 1994, How to make a decision: the analytic hierarchy process, Interfaces, 24(6), 19-43.
10.1287/inte.24.6.19
11
Singh, L.K., Jha, M.K., Chowdary, V.M., 2017, Multi-criteria analysis and GIS modeling for identifying prospective water harvesting and artificial recharge sites for sustainable water supply, Journal of Cleaner Production, 142(4), 1436-1456.
10.1016/j.jclepro.2016.11.163
12
Sun, Y., Wendi, D., Kim, D.E., Liong, S-Y., 2016, Technical note: Application of artificial neural networks in groundwater table forecasting - a case study in a Singapore swamp forest, Hydrology and Earth System Sciences, 20, 1405-1412.
10.5194/hess-20-1405-2016
13
Yaseen, Z.M., El-shafie, A., Jaafar, O., Afan, H.A., Sayl, K.N., 2015, Artificial intelligence based models for stream-flow forecasting: 2000-2015, Journal of Hydrology, 530, 829-844.
10.1016/j.jhydrol.2015.10.038
Information
  • Publisher :Korean Society of Engineering Geology
  • Publisher(Ko) :대한지질공학회
  • Journal Title :The Journal of Engineering Geology
  • Journal Title(Ko) :지질공학
  • Volume : 28
  • No :4
  • Pages :741-753
  • Received Date : 2018-11-12
  • Revised Date : 2018-12-21
  • Accepted Date : 2018-12-24